Specifications

FRAMEWORK

Reinforced M25 grade cement concrete slabs by ready-mix concrete with seismic analysis. 

Superstructure

Solid block, lightweight fly ash bricks.
a. Outer Walls: 6 inch solid fly ash bricks.
b. Inner Walls: 4 inch solid fly ash bricks. 

Flooring

Imported 1000 mm/ 1000 mm vitrified ceramic tile flooring for hall and dining room and imported wooden flooring for all the bedrooms. 

Sanitary & Plumbing works

All toilets with imported anti-skid ceramic tile flooring and ceramic tiles cladding up to ceiling height. Glass cubicle for each bathroom for separating dry and wet areas. Ceramic ware of Toto and sanitary fittings of Kohler or Grohe Equivalent. 

Doors and Windows

Main door - 4.6 feet wide, 50 mm thick double shutter panelled teak wood with teak-wood frame finished with melamine polish with good quality hardware by Dorset India. 

Internal doors - 3 feet wide, 35 mm thick two side veneered flush door shutters with teak wood frame fixed with good quality hardware by Dorset India. 

Windows - 30 mm teak wood panelled shutter with teak-wood frame finished with melamine polish with good quality hardware by Dorset India and cooling glass. 

Locks - Biometric digital locks by Yale for main door; all internal locks by Yale. 

Plastering

Internal walls and ceiling with double coated usually single coat smooth plastered surface treated with 3 coats of putty and painted with premium Asian Paints Royale Aspira. 

External walls with single coated plastered surface traded with premium structure paint, painted with weather proof Asian paints Apex Ultima. 

Kitchen

Aesthetically finished kitchen with polished granite platform with cladding and stainless steel sink by Franke. 

Electrical Installations

Modular switches - Revolutionary full flat switches of the Zencelo range by Schneider electric. 

Wiring - Flame retardant, low smoke heavy duty PVC conduit of Finolex. 

Power Backup

5 KVA 3 phase meter installation with 1 KVA DG power back up with automatic change over switch. 

Safety  

Designer Ms steel railings with safety grills designed in similar fashion and cctv monitoring In cellar and each corridor.

Intercom facility for all flats connected to the main gate entrance. 

Lift

6 passenger lift. Gear less and of stainless steel finish by Johnson with power back up and as a fail-safe an automatic restoration device. 



* The developer reserves the right to make changes in elevation, plans and specifications as deemed fit.